Fresh from the Inbox, Minnesota Power has responded to RRANT’s initial Information Requests:
Some will seem repetitive, but I’m just going around the same thing several ways…
The most interesting to me are the links in the response to IR 4 for MISO and other studies to justify or support building the GNTL project, THANK YOU Minnesota Power FOR SENDING WORKING LINKS:
System Impact Study (SIS) reports and meeting presentations
Draft SIS Report Prior Outage & Injection Analysis 7/9/2010
Draft SIS Report – TO Option 4/26/2010
Additional Impact Analysis Draft Report 4/20/2010
Executive Summary (Final Report) 7/20/2009
Final SIS Report Summer Peak analysis 7/20/2009
Final SIS Report Winter Peak analysis 7/20/2009
Final SIS Report Stability analysis 7/20/2009
Updated Draft Stability SIS Report analysis 6/29/2009
Updated Draft SIS Report- Winter Peak analysis 6/29/2009
Updated Draft SIS Report- Summer Peak analysis 6/29/2009
Draft Stability analysis 4/30/2009
Draft SIS Report- Winter Peak analysis 3/20/2009
Draft SIS Report- Summer Peak analysis 3/11/2009
Draft SIS Report 1/13/2009
Preliminary Draft SIS Report 12/16/2008
LT MH Study Screening results 1/21/2009
MH_TSR_Group Study_Transmission Options 1/21/2009
Facilities Study Reports and meeting presentations
MH-MP_AC_Thermal_Sensitivity_Analysis-Eastern_Plan-Draft_Report-01-07-13.pdf
MH-MP_AC_Thermal_Sensitivity_Analysis-Western_Plan-Draft_Report-01-07-13.pdf
MH-MP TSR meeting Feb 2013 3/6/2013
MH-MP TSR meeting Jan 2013_EPL 1/8/2013
MH-MP AC Thermal Sensitivity Analysis – Draft Report – 01-03-2013 1/8/2013
Dorsey – Iron Range 500 kV Project Preliminary Stability Analysis – Draft Report – 12-5-2012 1/8/2013
MH Group Study Option 1 FS 6/1/2010
MH Group Study CapX – TO presentation 11/4/2009
CapX FS proposal presentation 11/4/2009
Additional Analysis Scope document 11/4/2009
Final FS Report (GRE) 1/19/2010