Responses to initial Information Requests

mailbox

Fresh from the Inbox, Minnesota Power has responded to RRANT’s initial Information Requests:

RRANT_IR_001 – FINAL

RRANT_IR_002 – FINAL

RRANT_IR_003 – FINAL

RRANT_IR_004 – FINAL

RRANT_IR_005 – FINAL

RRANT_IR_006 – FINAL

RRANT_IR_007 – FINAL

RRANT_IR_008 – FINAL

RRANT_IR_009 – FINAL

RRANT_IR_010 – FINAL

RRANT_IR_011 – FINAL

RRANT_IR_012 – FINAL

RRANT_IR_013 – FINAL

RRANT_IR_014 – FINAL

RRANT_IR_015 – FINAL

Some will seem repetitive, but I’m just going around the same thing several ways…

The most interesting to me are the links in the response to IR 4 for MISO and other studies to justify or support building the GNTL project, THANK YOU Minnesota Power FOR SENDING WORKING LINKS:

System Impact Study (SIS) reports and meeting presentations

Draft SIS Report Prior Outage & Injection Analysis              7/9/2010

Draft SIS Report – TO Option                                                     4/26/2010

Additional Impact Analysis Draft Report                                 4/20/2010

Executive Summary (Final Report)                                           7/20/2009

Final SIS Report Summer Peak analysis                                   7/20/2009

Final SIS Report Winter Peak analysis                                      7/20/2009

Final SIS Report Stability analysis                                              7/20/2009

Updated Draft Stability SIS Report analysis                            6/29/2009

Updated Draft SIS Report- Winter Peak analysis                   6/29/2009

Updated Draft SIS Report- Summer Peak analysis               6/29/2009

Draft Stability analysis                                                                 4/30/2009

Draft SIS Report- Winter Peak analysis                                   3/20/2009

Draft SIS Report- Summer Peak analysis                                 3/11/2009

Draft SIS Report                                                                             1/13/2009

Preliminary Draft SIS Report                                                    12/16/2008

LT MH Study Screening results                                                  1/21/2009

MH_TSR_Group Study_Transmission Options                    1/21/2009

Facilities Study Reports and meeting presentations

MH-MP_AC_Thermal_Sensitivity_Analysis-Eastern_Plan-Draft_Report-01-07-13.pdf

MH-MP_AC_Thermal_Sensitivity_Analysis-Western_Plan-Draft_Report-01-07-13.pdf

MH-MP TSR meeting Feb 2013                                  3/6/2013

MH-MP TSR meeting Jan 2013_EPL                          1/8/2013

MH-MP AC Thermal Sensitivity Analysis – Draft Report – 01-03-2013      1/8/2013

Dorsey – Iron Range 500 kV Project Preliminary Stability Analysis – Draft Report – 12-5-2012    1/8/2013

MH Group Study Option 1 FS                                                      6/1/2010

MH Group Study CapX – TO presentation                              11/4/2009

CapX FS proposal presentation                                                  11/4/2009

Additional Analysis Scope document                                       11/4/2009

Final FS Report (GRE)                                                                1/19/2010

 