Note this project’s start at the Iron Range substation, where the Great Northern Transmission Project ends:
Application for the Iron Range to Arrowhead transmission line is IN, well, ARE in, both the Certificate of Need and Transmission Routing — JOINT application. Check out Appendix J – it’s from the EQB’s Exemption docket for Arrowhead-Weston! There’s the EQB Exemption, the ALJ’s Recommendation (from a 2 week hearing) and the TRANSCRIPT from the EQB meeting where we got the 800MVA limitation on the output of the Arrowhead substation into Wisconsin. What a hoot!