It’s a Final Environmental Impact Statement kind of day today. The Great Northern Transmission Line FINAL EIS has been released by the Deptartment of Energy, which is in charge of the Presidential Permit and so they’re doing joint environmental review with the State of Minnesota. It’s out, released while I was on the road, and so here it is, a couple days late!
And here’s a cut and paste of their format, which is a LOT better than the PUC’s official eDockets page:
Final Environmental Impact Statement
Main Document
- Cover Sheet and Table of Contents
- Summary
- Chapter 1 – Regulatory Framework: Describes the regulatory framework associated with the proposed Project, including the purpose and need for agency action, major federal permits (including the U.S. DOE Presidential permit), federal consultation requirements, state permitting requirements (including the MN PUC Route Permit), other state and local permits, and a summary of agencies, tribes, and persons consulted.
- Chapter 2 – Proposed Project: Describes the project as proposed by the Applicant including proposed routes, structures, objectives, route selection process, estimated costs, and proposed schedule. Chapter 2 also describes the Applicant’s engineering, design, and construction plans, land acquisition processes, and Applicant proposed measures to avoid and minimize environmental impacts.
- Chapter 3 – No Action Alternative: Describes the “No Action alternative,” in which the DOE would not issue a Presidential permit and the proposed Project would not be built. The analysis of the No Action alternative summarizes the impacts of not constructing the project and provides a baseline for analyzing and comparing potential environmental impacts from DOE’s proposed action and alternatives.
- Chapter 4 – Route and Alignment Alternatives Proposed During Scoping: Describes the four border crossing alternatives, 22 route variations, and nine alignment modifications that were proposed by agencies and the public during scoping. Chapter 4 also summarizes the process used by DOE in coordination with the DOC-EERA to jointly determine which border crossings and routes to include in the scope of this EIS. Chapter 4 also describes how the selected routes, route variations, and alignments are analyzed by dividing the 220-mile long project area into the three major sections: the West Section, the Central Section, and the East Section.
- Chapter 5 Part 1 – Affected Environment and Potential Impacts: Describes the affected environment for the proposed Project, including descriptions of each resource, the region of influence (ROI) of the proposed Project on the resource, and impacts expected from the construction, operation, maintenance, and connection of the proposed Project. Chapter 5.0 first describes the impacts of the proposed Project that are common to all geographic sections and do not vary by route or route variation. Chapter 5.0 then describes the resources that do vary by geographic section and for which impacts vary by route and route variation—the impacts and resources are carried forward for detailed analysis and comparison in Chapter 6.0.
- Chapter 5 Part 2 – Affected Environment and Potential Impacts
- Chapter 6 Part 1 – Comparative Environmental Consequences: Presents detailed analysis and comparison of the potential human and environmental impacts of the proposed Project and alternative route variations, and describes mitigation measures by geographic section, route, and route variation.
- Chapter 6 Part 2 – Comparative Environmental Consequences
- Chapter 6 Part 3 – Comparative Environmental Consequences
- Chapter 7 Cumulative and Other Impacts: Describes reasonably foreseeable projects in the proposed Project area and assesses impacts of the proposed Project in the context of these reasonably foreseeable projects along with other past and present projects in the same area. Chapter 7 also describes unavoidable, irretrievable, and other impacts as required by federal and state regulations.
- Chapter 8 – List of Preparers
- Chapter 9 – References
- Chapter 10 – Acronyms
- Chapter 11 – Index
Appendices
- Appendix A – Tribal Consultations: Provides documentation of and correspondence for the DOE’s government-to-government consultation under Section 106 of the National Historic Preservation Act (National Historic Preservation Act (NHPA) and in accordance with Executive Order 13175.
- Appendix B – Route Permit Generic Template and Example: Provides documentation of and correspondence for the DOE’s government-to-government consultation under Section 106 of the National Historic Preservation Act (National Historic Preservation Act (NHPA) and in accordance with Executive Order 13175.
- Appendix C – Narrative of the Scoping Summary Report: Provides the narrative from the EIS Scoping Summary Report summarizing the joint scoping process and associated public and agency comments provided during the public scoping period for the proposed Project.
- Appendix D – DOC-EERA Scoping Decisions: Provides the DOC-EERA scoping decision issued for this EIS on January 8, 2015.
- Appendix E – Route Analysis Data Tables: Provides detailed data for the right-of-way (ROW), route, and region-of-interest (ROI) for the proposed routes and variations analyzed in this EIS.
- Appendix F – Rare Species Data Tables: Provides detailed MnDNR Natural Heritage Information System rare species data for the ROW, route, and region-of-interests (ROIs) for the proposed routes and variations analyzed in this EIS.
- Appendix G – Rare Communities Data Tables: Provides detailed Minnesota Biological Survey native plant community rare communities data for the ROW, route, and region-of-interests (ROIs) for the proposed routes and variations analyzed in this EIS.
- Appendix H – Noise Supplement: Provides terminology and regulations for noise and project-specific noise information.
- Appendix I – Applicant’s Audible Noise and EMF Calculations: Provides the Applicant’s modelling results for audible noise, electric and magnetic field (EMF), and corona effects from the proposed Project.
- Appendix J – Property Values Supplement: Provides information and literature regarding the effect of transmission lines on property values.
- Appendix K – EMF Supplement: Provides information regarding EMF.
- Appendix L – Stray Voltage Supplement – Part 1: Provides information regarding stray voltage.
- Appendix L – Stray Voltage Supplement – Part 2
- Appendix L – Stray Voltage Supplement – Part 3
- Appendix L – Stray Voltage Supplement – Part 4
- Appendix M – MPCA What’s In My Neighborhood Sites: Provides a list of sites in the proposed Project area identified by the Minnesota Pollution Control Agency (MPCA) program – What’s In My Neighborhood” – that may have environmental permits or registrations, or are potentially contaminated sites.
- Appendix N – Photo Simulations – Part 1: Provides photo simulations developed for sensitive viewsheds identified in public comments during the public scoping period for the proposed Project.
- Appendix N – Photo Simulations – Part 2
- Appendix N – Photo Simulations – Part 3
- Appendix N – Photo Simulations – Part 4
- Appendix N – Photo Simulations – Part 5
- Appendix N – Photo Simulations – Part 6
- Appendix N – Photo Simulations – Part 7
- Appendix N – Photo Simulations – Part 8
- Appendix N – Photo Simulations – Part 9
- Appendix O – Agricultural Impact Mitigation Plan Example: Provides an example of a AIMP prepared for a high-voltage transmission line project.
- Appendix P – Cultural Resources Report: Provides the Phase IA cultural resources survey report for the proposed Project.
- Appendix Q – USFWS and DOE Section 7 Consultation: Provides the USFWS letter initiating informal consultation with the DOE under Section 7(a)(2) of the Endangered Species Act (ESA) for the proposed Project.
- Appendix R – Biological Assessment: Provides the report which reviews the proposed Project in sufficient detail to determine if the proposed action may affect any federally threatened or endangered species and/or critical habitat.
- Appendix S – Detailed Map Books – Part 1: Provides maps with detailed information for the ROWs and routes for the proposed routes and variations discussed in this EIS.
- Appendix S – Detailed Map Books – Part 2
- Appendix S – Detailed Map Books – Part 3
- Appendix S – Detailed Map Books – Part 4
- Appendix S – Detailed Map Books – Part 5
- Appendix S – Detailed Map Books – Part 6
- Appendix S – Detailed Map Books – Part 7
- Appendix S – Detailed Map Books – Part 8
- Appendix T – NEPA Disclosure Statements: Provides signed copies of the NEPA Disclosure Statements.
- Appendix U – USFWS Recommended Route
- Appendix V – Draft Programmatic Agreement
- Appendix W – Air Emissions Information
- Appendix X – Relative Merits Summary
- Appendix Y – Comments and Responses – Part 1
- Appendix Y – Comments and Responses – Part 2
- Appendix Y – Comments and Responses – Part 3
- Appendix Y – Comments and Responses – Part 4
- Appendix Y – Comments and Responses – Part 5
- Appendix Y – Comments and Responses – Part 6
- Appendix Y – Comments and Responses – Part 7
- Appendix Y – Comments and Responses – Part 8
- Appendix Z – EIS Distribution List
Here’s the filing from Commerce – I’ve deleted a few columns from the PUC’s eDockets so it’ll fit here, and it’s in no discernable order, that’s why I prefer the version above:
201511-115405-01 | 14-21 | DOC EERA | NOTICE–OF AVAILABILITY OF FINAL ENVIRONMENTAL IMPACT STATEMENT | 11/03/2015 |
201510-115238-06 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX F | 10/30/2015 |
201510-115262-01 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX Z | 10/30/2015 |
201510-115248-06 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX M | 10/30/2015 |
201510-115258-01 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX S – MAP BOOK CENTRAL SECTION – PART 1 OF 6 | 10/30/2015 |
201510-115261-02 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX U | 10/30/2015 |
201510-115251-10 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX R | 10/30/2015 |
201510-115248-04 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX L – PART 3 OF 4 | 10/30/2015 |
201510-115261-07 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX Y – PART 2 OF 5 | 10/30/2015 |
201510-115232-03 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 1 – PART 13 OF 14 | 10/30/2015 |
201510-115231-02 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 1 – PART 10 OF 14 | 10/30/2015 |
201510-115251-08 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX P | 10/30/2015 |
201510-115238-03 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX C | 10/30/2015 |
201510-115231-01 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 1 – PART 9 OF 14 | 10/30/2015 |
201510-115238-09 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX I | 10/30/2015 |
201510-115238-02 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX B | 10/30/2015 |
201510-115251-09 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX Q | 10/30/2015 |
201510-115251-04 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX N – PART 8 OF 10 | 10/30/2015 |
201510-115258-05 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX S – MAP BOOK CENTRAL SECTION – PART 5 OF 6 | 10/30/2015 |
201510-115248-01 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX K | 10/30/2015 |
201510-115238-01 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX A | 10/30/2015 |
201510-115261-04 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX W | 10/30/2015 |
201510-115258-06 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX S – MAP BOOK CENTRAL SECTION – PART 6 OF 6 | 10/30/2015 |
201510-115248-05 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX L – PART 4 OF 4 | 10/30/2015 |
201510-115248-10 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX N – PART 4 OF 10 | 10/30/2015 |
201510-115238-04 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX D | 10/30/2015 |
201510-115258-07 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX S – MAP BOOK EAST SECTION – PART 1 OF 2 | 10/30/2015 |
201510-115232-01 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 1 – PART 11 OF 14 | 10/30/2015 |
201510-115251-06 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX N – PART 10 OF 10 | 10/30/2015 |
201510-115232-02 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 1 – PART 12 OF 14 | 10/30/2015 |
201510-115238-08 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX H | 10/30/2015 |
201510-115258-04 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX S – MAP BOOK CENTRAL SECTION – PART 4 OF 6 | 10/30/2015 |
201510-115258-03 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX S – MAP BOOK CENTRAL SECTION – PART 3 OF 6 | 10/30/2015 |
201510-115248-03 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX L – PART 2 OF 4 | 10/30/2015 |
201510-115258-08 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX S – MAP BOOK EAST SECTION – PART 2 OF 2 | 10/30/2015 |
201510-115251-07 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX O | 10/30/2015 |
201510-115251-05 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX N – PART 9 OF 10 | 10/30/2015 |
201510-115238-07 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX G | 10/30/2015 |
201510-115261-06 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX Y – PART 1 OF 5 | 10/30/2015 |
201510-115261-08 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX Y – PART 3 OF 5 | 10/30/2015 |
201510-115238-10 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX J | 10/30/2015 |
201510-115261-05 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX X | 10/30/2015 |
201510-115251-03 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX N – PART 7 OF 10 | 10/30/2015 |
201510-115248-09 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX N – PART 3 OF 10 | 10/30/2015 |
201510-115258-09 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX S – MAP BOOK WEST SECTION – PART 1 OF 2 | 10/30/2015 |
201510-115258-02 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX S – MAP BOOK CENTRAL SECTION – PART 2 OF 6 | 10/30/2015 |
201510-115248-07 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX N – PART 1 OF 10 | 10/30/2015 |
201510-115258-10 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX S – MAP BOOK WEST SECTION – PART 2 OF 2 | 10/30/2015 |
201510-115261-09 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX Y – PART 4 OF 5 | 10/30/2015 |
201510-115248-08 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX N – PART 2 OF 10 | 10/30/2015 |
201510-115238-05 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX E | 10/30/2015 |
201510-115261-03 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX V | 10/30/2015 |
201510-115251-02 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX N – PART 6 OF 10 | 10/30/2015 |
201510-115261-10 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX Y – PART 5 OF 5 | 10/30/2015 |
201510-115251-01 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX N – PART 5 OF 10 | 10/30/2015 |
201510-115261-01 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX T | 10/30/2015 |
201510-115248-02 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 2 – APPENDIX L – PART 1 OF 4 | 10/30/2015 |
201510-115232-04 | 14-21 | DOC EERA | OTHER–FINAL EIS – VOLUME 1 – PART 14 OF 14 | 10/30/2015 |