Category Archives: FERC Filings

And GNTL is energized…

The Great Northern Transmission Line has been energized, and RRANTing is over. Right on schedule, as above, Minnesota Power’s Great Northern Transmission Line is up and running, bringing Manitoba Hydro generated electricity to Minnesota, and likely beyond.

Here’s their press release, hot off the press from Minnesota Power, but I got sidetracked:

In Minnesota as proposed:

In Canada:

And in the air:

And the press lapped it up:

Minnesota Power to reach 50% renewables in 2021 with Canadian hydropower

Minnesota Power energizes Great Northern Transmission Line, bringing 250 MW delivery capabilities online

And it looks like a cut and paste of the MP press release in the Grand Rapids paper:

Minnesota Power energizes Great Northern Transmission Line to move company closer to 50 percent renewable energy by 2021

This was a LONG project, starting at the PUC in 2012, EIGHT YEARS AGO, with Minnesota Power’s planning starting long before that.

To look at the full Public Utilities Commission siting docket, go HERE and search for 14-21. The Certificate of Need docket is 12-1163.

There was also a DOE Presidential Permit, that’s where the DOE’s Environmental Impact Statement came in, a limited scope:

There were also three FERC dockets regarding Zonal Agreements, ER16-1107, ER16-110, an ER16-1116.

And then there’s Canada!

Open houses beginning in Canada for GNTL

January 17 – Canada will announce public hearings

Canada’s National Energy Board recommends “MMTP”

Suffice it to say, this was a long and complicated haul. As well it should be, two countries involved, and multiple agencies here in the U.S. and Minnesota. So many road shows, and I sure couldn’t go on all of them.

There were some really cold meetings, I remember one in the ambulance hall, because I was handing out flyers, freezing… Here’s what I’d been handing out in attempt to let people know how to weigh in. They’re affected, they’re right there, and they know the situation on the ground.

Handout – November GNTL Meetings

Notice Plan Comment Form – click to download editable form

I usually did that outside, but whew, but sometimes it was TOO COLD:

That’s the meeting where MP folks were not too happy that I brought up my Susquehanna-Roseland transmission line details of the capacity for that initially quad-bundled 500 kV line, MVA over 4,000. This line is pretty much the same, though now I can’t remember if this is quad or “just” tri-bundled. It’s absurd design for “250 MW” load, so we know there’s going to be more. Though with the energy market as it is, can’t see a need for more anytime soon, and with COVID shutdown, Minnesota Power demand is down 40% or so.

It was so cold that first year. Minnesota Power held its own PR meetings before it even formally applied, in International Falls circa 2012:

In Grand Rapids at the Sawmill:

Formal meetings were held later, also in Grand Rapids. And Burl Ives (yes, that’s his name, and he’s a County Commissioner, District 4, now) wasn’t thrilled that I was handing out flyers at his hotel, but we had a good chat and he got it, he saw that I was graciously greeting people and handing out info, not making them run the gauntlet:

And Taconite?

And 2013, another cold winter road show, THE COLDEST, this was in the ambulance garage, and I really did not have fun on this road show:

In 2014, we had meetings in warmth, all over, another road show, well attended, with good treats:

Note the Executive Order, E.O. 12038:

And some not so well attended…

And came 2015, the DOE’s EIS meetings, unbearably hot, unfunded so couldn’t get hotel, and we stayed in site 12 in Big Bog State Park in our “new” pop-up, the site had a dock, and was swarming with bugs, the worst I’ve ever experienced. NEVER AGAIN! We were picking out bug carcasses for years afterward (there were still bugs embedded in the screens when we sold it last fall!).

And then the rain, the Rainy River was overflowing the banks, one city’s municipal campground was flooded, standing water everywhere through torrential rainfall and super high winds:

Who knew there were honey bee colonies all over along Hwy 11??

And PUC hearings the following month, another series of road shows:

Then the PUC’s permit:

And now it’s up and running… sigh…

Leave a Comment

Filed under Canada permitting, Certificate of Need, DOE (Dept of Energy), Environmental Review, FERC Filings, Hearings, Media, Meetings, MP, Need, Open Houses, Presidential Permit, PUC Filings, Routing Docket

GNTL – FERC Docket and Comments

FERClogo

Looks like MP, GRE, and MISO are trying to shift things around through new “Zonal Agreements.  I learned about this scrolling through the junk box — those newsletters can be a great source of info, but getting to the wheat takes some wading.

So after learning about this docket, and getting the FERC_Notice_Extenstion_20160330-3021(31346379) filing, stating that the Comment period had been extended for interested parties, that TODAY was the deadline, I quick filed this on behalf of RRANT:

Comments_RRANT_ER16-1107_ER16-1108_ER16-1116

What’s this about?  MP, GRE and MISO have filed new “Zonal Agreements” which are:

  1. Coordinated Local Planning Agreement
  2. Joint Pricing Zone Revenue Allocation Agreement
  3. Revenue Credit Agreement for the Great Northern Transmission Line Project
  4. Wholesale Distribution Service Agreement

Missouri River Energy Services (MRES) objected, “protested” and filed a Motion to Intervene and I think they’ve got credible points, that these filings would/could have the impact of transferring GNTL costs to non-Minnesota Power ratepayers, despite this being a “participant funded” project.  Here’s their Motion:

MRES_Intrervention & Request for Extension_20160324-5182(31336403)

And to that, here’s their response:

MP & GRE_Joint Answer 2 MRES_20160329-5071(31343963)

To look at the proposed “Zonal Agreements” and everything filed in this docket, go HERE (FERC eLibrary) and scroll down to “Docket Number” and plug in “ER16-1116” (for cancellation docket) and “ER16-1107” and/or “ER16-1108” for the new agreements (BIG FILES).

What does all this mean?  I think they’re trying to circumvent the policies of FERC (and Minnesota PUC, too) regarding “participant funded” transmission projects, and/or trying to shift the costs of the Great Northern Transmission Project to other rate payers, beyond the “participants.”  Possible?  Yes.  Only time and SCRUTINY will tell if that’s the case.  As MRES notes, and of course MP and GRE objects to that characterization, these were negotiated “outside of Commission processes” and are inconsistent with MISO tariff and Commission precedent.  Let’s get it all out in the sun and give it a look-see!

 