{"id":497,"date":"2014-05-21T17:53:39","date_gmt":"2014-05-21T17:53:39","guid":{"rendered":"http:\/\/not-so-great-northern-transmission-line.org\/?p=497"},"modified":"2014-05-21T18:02:21","modified_gmt":"2014-05-21T18:02:21","slug":"obama-pushing-gntl-progress-not","status":"publish","type":"post","link":"https:\/\/not-so-great-northern-transmission-line.org\/?p=497","title":{"rendered":"Obama pushing GNTL &#8211; progress NOT!"},"content":{"rendered":"<p><a href=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/05\/Obama-Progress.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-498\" src=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/05\/Obama-Progress.jpg\" alt=\"Obama-Progress\" width=\"112\" height=\"168\" \/><\/a><\/p>\n<p>(Yes, I know, this happened on May 17, but that was in the middle of this ITC Midwest mess of Public and Evidentiary hearing, AAAAAAGH!)<\/p>\n<p>Pres. Obama, do explain how locking us into outmoded infrastructure for long distance transmission of central station power is in the public interest?\u00a0 For a long time, we&#8217;ve known Obama is from a coal state and takes a lot of money from dirty interests, like coal and energy and utility interests, and we&#8217;ve known for a long time that Obama promotes transmission:<\/p>\n<blockquote>\n<h2><a title=\"Permanent Link to What does Obama\u2019s Xmsn push mean?\" href=\"https:\/\/legalectric.org\/weblog\/7169\/\" rel=\"bookmark\">What does Obama\u2019s Xmsn push mean?<\/a><\/h2>\n<h2><a title=\"Permanent Link to Obama\u2019s Transmission BS in the News\" href=\"https:\/\/legalectric.org\/weblog\/7152\/\" rel=\"bookmark\">Obama\u2019s Transmission BS in the News<\/a><\/h2>\n<\/blockquote>\n<p>Now we have yet another example of what it means, as if <a href=\"http:\/\/www.mprnews.org\/story\/2011\/10\/05\/obama-powerlines\"><strong>&#8220;fast-tracking&#8221; the CapX 2020 Hampton-LaCrosse transmission line<\/strong><\/a> wasn&#8217;t enough.<\/p>\n<blockquote>\n<h4><a href=\"http:\/\/www.whitehouse.gov\/the-press-office\/2014\/05\/14\/fact-sheet-building-21st-century-infrastructure-modernizing-infrastructu\"><strong>FACT SHEET \u2013 Building a 21st Century Infrastructure: Modernizing Infrastructure Permitting<\/strong><\/a><\/h4>\n<\/blockquote>\n<p>Read this carefully, because media has been MISREPORTING this as some sort of approval, &#8220;a nod&#8221; or worse.\u00a0 Really, it&#8217;s much ado about nothing.\u00a0 All this means is that the feds have received Minnesota Power&#8217;s Presidential Permit application and put it in queue, on their <a href=\"http:\/\/www.permits.performance.gov\/\">Federal Infrastructure Projects Permitting Dashboard<\/a>. Here&#8217;s the link for the Not-so-Great Northern Transmission Line, listed as an upcoming project, and there&#8217;s really no information here, nothing about schedule, no contact people, nothing about how to get on service list or any other manner of notification:<\/p>\n<blockquote><p><strong><a href=\"http:\/\/www.permits.performance.gov\/pdfs\/Great%20Northern%20Transmission%20Line.pdf\" target=\"_blank\">Great Northern Transmission Line<\/a><\/strong><\/p><\/blockquote>\n<p>And here&#8217;s their Presidential Permit Application, it&#8217;s pretty much a cut and paste of their Minnesota application (thanks MP for sending a hard copy!):<\/p>\n<div>\n<h3>Presidential Permit Application<\/h3>\n<ul>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/213\/270\/\"> Presidential Permit Executive Summary <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/214\/270\/\"> Presidential Permit Application Book 1 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/219\/270\/\"> Appendix A Mapbook Book 2 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/224\/270\/\"> Appendix B Segment Calcs Book 2 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/220\/270\/\"> Appendix C Pub Agency Involvement Book 3 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/215\/270\/\"> Appendix D Infrastructure Book 3 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/212\/270\/\"> Appendix E Methods and Regulations Book 3 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/216\/270\/\"> Appendix F Noise Summary Tables Plots Book 3 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/218\/270\/\"> Appendix G Phase IA Literature Search Book 3 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/221\/270\/\"> Appendix H Landowner List Book 3 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/217\/270\/\"> Appendix I Electric Magnetic Fields Book 3 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/223\/270\/\"> Appendix J Opinion of Council Book 3 <\/a><\/li>\n<li><a href=\"http:\/\/greatnortherntransmissionline.com\/index.php\/download_file\/222\/270\/\"> Appendix K Power Flow Analysis Book 3 <\/a><\/li>\n<\/ul>\n<\/div>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n<p>&nbsp;<\/p>\n","protected":false},"excerpt":{"rendered":"<p>(Yes, I know, this happened on May 17, but that was in the middle of this ITC Midwest mess of Public and Evidentiary hearing, AAAAAAGH!) Pres. Obama, do explain how locking us into outmoded infrastructure for long distance transmission of &hellip; <a href=\"https:\/\/not-so-great-northern-transmission-line.org\/?p=497\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[37],"tags":[18,17,38,16,131,30,34],"class_list":["post-497","post","type-post","status-publish","format-standard","hentry","category-presidential-permit","tag-manitoba-hydro","tag-minnesota-power","tag-obama","tag-powerline","tag-presidential-permit","tag-residents-and-ratepayers-against-not-so-great-northern-transmission","tag-transmission-line"],"_links":{"self":[{"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/posts\/497","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=497"}],"version-history":[{"count":3,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/posts\/497\/revisions"}],"predecessor-version":[{"id":501,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/posts\/497\/revisions\/501"}],"wp:attachment":[{"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=497"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=497"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=497"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}