{"id":227,"date":"2014-01-14T15:44:00","date_gmt":"2014-01-14T15:44:00","guid":{"rendered":"http:\/\/not-so-great-northern-transmission-line.org\/?p=227"},"modified":"2014-02-10T00:23:12","modified_gmt":"2014-02-10T00:23:12","slug":"scheduling-for-gntl-certificate-of-need-proceeding","status":"publish","type":"post","link":"https:\/\/not-so-great-northern-transmission-line.org\/?p=227","title":{"rendered":"Scheduling for GNTL Certificate of Need proceeding"},"content":{"rendered":"<p>We&#8217;re inching forward in the scheduling for the Not-so-Great Northern Transmission line proceeding at OAH.\u00a0 Commerce and Minnesota Power have sent in proposals, Commerce for the public hearings across the state, and MP for the whole shebang!<\/p>\n<p>The Prehearing Conference is on Friday, THIS Friday, the 17th at 10 a.m. in the PUC&#8217;s Small Hearing Room.<\/p>\n<p>Here are the proposals, starting with the TENTATIVE public hearing schedule:<\/p>\n<p><a href=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/PublicHearingSched.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-229\" alt=\"PublicHearingSched\" src=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/PublicHearingSched.jpg\" width=\"449\" height=\"181\" srcset=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/PublicHearingSched.jpg 786w, https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/PublicHearingSched-300x120.jpg 300w\" sizes=\"auto, (max-width: 449px) 100vw, 449px\" \/><\/a><\/p>\n<p>Here&#8217;s MP&#8217;s proposed environmental review schedule (and it&#8217;s way too ambitious, Commerce can&#8217;t get anything done that fast, we&#8217;re always waiting for environmental review, and the public hearings shouldn&#8217;t be held before that&#8217;s done!):<\/p>\n<p><a href=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/MPsEnvRevSched.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-230\" alt=\"MPsEnvRevSched\" src=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/MPsEnvRevSched.jpg\" width=\"451\" height=\"167\" srcset=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/MPsEnvRevSched.jpg 790w, https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/MPsEnvRevSched-300x111.jpg 300w\" sizes=\"auto, (max-width: 451px) 100vw, 451px\" \/><\/a><\/p>\n<p>And MP&#8217;s Hearing schedule (HA!):<\/p>\n<p><a href=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/MPsHearingSched.jpg\"><img loading=\"lazy\" decoding=\"async\" class=\"alignnone  wp-image-231\" alt=\"MPsHearingSched\" src=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/MPsHearingSched.jpg\" width=\"450\" height=\"436\" srcset=\"https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/MPsHearingSched.jpg 540w, https:\/\/not-so-great-northern-transmission-line.org\/wp-content\/uploads\/2014\/01\/MPsHearingSched-300x291.jpg 300w\" sizes=\"auto, (max-width: 450px) 100vw, 450px\" \/><\/a><\/p>\n<p>Less than a year for a 200+ mile part of a US\/Canadian 500 kV line?\u00a0 You be dreamin&#8217;.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>We&#8217;re inching forward in the scheduling for the Not-so-Great Northern Transmission line proceeding at OAH.\u00a0 Commerce and Minnesota Power have sent in proposals, Commerce for the public hearings across the state, and MP for the whole shebang! The Prehearing Conference &hellip; <a href=\"https:\/\/not-so-great-northern-transmission-line.org\/?p=227\">Continue reading <span class=\"meta-nav\">&rarr;<\/span><\/a><\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[3,4,12,6],"tags":[],"class_list":["post-227","post","type-post","status-publish","format-standard","hentry","category-hearings","category-meetings","category-need","category-puc-filings"],"_links":{"self":[{"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/posts\/227","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcomments&post=227"}],"version-history":[{"count":5,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/posts\/227\/revisions"}],"predecessor-version":[{"id":235,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=\/wp\/v2\/posts\/227\/revisions\/235"}],"wp:attachment":[{"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=%2Fwp%2Fv2%2Fmedia&parent=227"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=%2Fwp%2Fv2%2Fcategories&post=227"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/not-so-great-northern-transmission-line.org\/index.php?rest_route=%2Fwp%2Fv2%2Ftags&post=227"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}